Main Page / Press-service /
News
News
News archive
08.12.06

The Acceptance Committee, comprised of the JSC TVEL, Rosenergoatom, Rostekhnadzor (Federal Service for Supervision of Environment, Technology and Nu­clear Management), Russian Research Center KIAE, FSUE OKB Gidropress, SUE KPI and JSC MSZ rep­resentatives have successfully tested the VVER-440 FA components (caps, tailpieces, grids), fabricated from the precision casting workpieces.

The tests showed that the fabricated components fully comply with design documenta­tion.

The signing of the final acceptance protocol was ensured by extensive preparatory work of quite a number of company’s departments: Production Planning, Engineering, Tech­nical, R&D, Central Laboratory, Marketing and Component Production.

Since the components fabrication uses rolling, the method that generates a lot of chip wastes of expensive material, the company was challenged to come up with workpieces that fitted the weight of the parts as much as possible. One of the possible ways to ob­tain the required workpieces is to use the precise casting or mould casting method.

With 300 years of experience in casting, the german-based Zollern Company undertook to produce the cast workpieces by JSC MSZ’ order. Last year, JSC MSZ placed with the Zollern Company orders for 3 pilot batches. The cast workpieces were delivered in Au­gust and now the obligations of the Zollern Company are completely fulfilled.

The components, produced from the workpieces, will build the VVER-440 FAs for Kola NPP.

By the end of this year, the Zollern Company is to deliver a pilot batch of the cast workpieces for the VVER-1000 FA. The batch will undergo complex tests before it is settled to run the production.

top
Copyright © 2004 Элемаш
All rights reserved.
Разработка сайта - РБК СОФТ
JSC "Mashinostroitelny Zavod",
12, K. Marksa str., Electrostal, Moscow region, Russian Federation, 144001.
Tel: +7 (495) 702-9901
Fax: +7 (495) 702-9221
E-mail: zymsz@elemash.ru